in ,

"We walk the lower corridor, the old Nichido sidewalk, horizontal footpath" again

Articles that have been posted on my personal site so far"We walk the lower corridor, the old Nichido sidewalk, the horizontal sidewalk" all 9However, we moved here to coincide with the start of PORTALFIELD.

The repositioning has been reworked with focus on making the date and time display easy to understand. There is a lot of volume, so please look like reading a short story.

"We walk the lower corridor, the old Nichido sidewalk, the horizontal sidewalk" all 9

2016 / 10 / 15 ~ 17 walk from the Shimono corridor, the old Niden walkway route, 1 day 10 / 15 access to Kurobe dam & lodge Kuroyon accommodation. Itinerary: Shinjuku → Shinano Omachi → Ogizawa → Kurobe Dam → Lodge Kuroyon. In 2016 this year, the Shimono Corridor opens! The Tateyama and Kurobe areas are basically areas where the Tateyama Kurobe Alpine Route is often used,

2016 lower corridor, walking the old NDC footpath 10/15 edition Ogisawa → Kurobe dam → Lodge Kuroyon

2016 / 10 / 15 ~ 17 walk from the Shimono corridor, the old Niden walkway route, 1 day 10 / 15 access to Kurobe dam & lodge Kuroyon accommodation. Itinerary: Shinjuku → Shinano Omachi → Ogizawa → Kurobe Dam → Lodge Kuroyon. In 2016 this year, the Shimono Corridor opens! The Tateyama and Kurobe areas are basically areas where the Tateyama Kurobe Alpine Route is often used, More

From the lower corridor, which used to walk on the date of 2016 / 10 / 15 to 17, from the former Nichido trail route, from lodge Kuroyon of XNUM day 2 / 10 to Azohara Onsen Goya, lodge Kuroyon → built-in Sugaya Ide Hen. The travel map is here. On this day's journey, lodge Kuroyon → Kurobe Dam → Built-In Sotani Ide → Betsukan Valley Ide → Hakuryu Gorge → Cross Gorge → S-shaped Gorge → Senjin Valley Dam → Azohara Onsen Goya.

2016 lower corridor, walking the old NDC sidewalk 10/16 compilation-1 Lodge Kuroyon → Kuranosuketan deai

From the lower corridor, which used to walk on the date of 2016 / 10 / 15 to 17, from the former Nichido trail route, from lodge Kuroyon of XNUM day 2 / 10 to Azohara Onsen Goya, lodge Kuroyon → built-in Sugaya Ide Hen. The travel map is here. On this day's journey, lodge Kuroyon → Kurobe Dam → Built-In Sotani Ide → Betsukan Valley Ide → Hakuryu Gorge → Cross Gorge → S-shaped Gorge → Senjin Valley Dam → Azohara Onsen Goya. More

From the lower corridor, which used to walk on the date of 2016 / 10 / 15 to 17, from the former Nippon Electric trail route, from the lodge Kuroyon of the XNUM X day 2 / 10 to Azohara Onsen Goya, built-in Sugaya Idei → another Yamaya Ide. The travel map is here. On this day's journey, lodge Kuroyon → Kurobe Dam → Built-In Sotani Ide → Betsukan Valley Ide → Hakuryu Gorge → Cross Gorge → S-shaped Gorge → Senjin Valley Dam → Azohara Onsen Goya.

2016 lower corridor, walking the old NDC footpath 10/16 compilation-2 Kuranosuketan deai → Bessantan deai

From the lower corridor, which used to walk on the date of 2016 / 10 / 15 to 17, from the former Nippon Electric trail route, from the lodge Kuroyon of the XNUM X day 2 / 10 to Azohara Onsen Goya, built-in Sugaya Idei → another Yamaya Ide. The travel map is here. On this day's journey, lodge Kuroyon → Kurobe Dam → Built-In Sotani Ide → Betsukan Valley Ide → Hakuryu Gorge → Cross Gorge → S-shaped Gorge → Senjin Valley Dam → Azohara Onsen Goya. More

Shimonono Corridor, Bepsanzan Idei-Cross Gorge section

2016 lower corridor, walking the old NDC footpath 10/16 compilation-3 by Bessantan deai → Cross Gorge

From the lower corridor, which has walked on the date of 2016 / 10 / 15 to 17, from the old Nichido trail route, from lodge Kuroyon of the XNUM day 2 / 10 to Azohara Onsen Goya, another mountain valley Ide → Cross Gorge. The travel map is here. On this day's journey, lodge Kuroyon → Kurobe Dam → Built-In Sotani Ide → Betsukan Valley Ide → Hakuryu Gorge → Cross Gorge → S-shaped Gorge → Senjin Valley Dam → Azohara Onsen Goya. More

From the lower corridor, which has walked on the date of 2016 / 10 / 15 to 17, from the former Nippon Electric Trail route, from the lodge Kuroyon of the XNUM day 2 / 10 to the Azohara Onsen Goya, the Cross Gorge → S-shaped Gorge. The travel map is here. On this day's journey, lodge Kuroyon → Kurobe Dam → Built-In Sotani Ide → Betsukan Valley Ide → Hakuryu Gorge → Cross Gorge → S-shaped Gorge → Senjin Valley Dam → Azohara Onsen Goya.

2016 Lower corridor, walking the old NDC Walkway 10/16 -4 Cross Gorge → S-shaped Gorge

From the lower corridor, which has walked on the date of 2016 / 10 / 15 to 17, from the former Nippon Electric Trail route, from the lodge Kuroyon of the XNUM day 2 / 10 to the Azohara Onsen Goya, the Cross Gorge → S-shaped Gorge. The travel map is here. On this day's journey, lodge Kuroyon → Kurobe Dam → Built-In Sotani Ide → Betsukan Valley Ide → Hakuryu Gorge → Cross Gorge → S-shaped Gorge → Senjin Valley Dam → Azohara Onsen Goya. More

From the lower corridor in the 2016 / 10 / 15 to 17, from the old Nichido trail route, from the lodge Kuroyon of the XNUM day 2 / 10 to Azohara Onsen Goya, S-shaped → Senjindani Dam → Azohara Onsen Goya ed. The travel map is here. On this day's journey, lodge Kuroyon → Kurobe Dam → Built-In Sotani Ide → Betsukan Valley Ide → Hakuryu Gorge → Cross Gorge → S-shaped Gorge → Senjin Valley Dam → Azohara Onsen Goya.

Walk down the old Nichimu sidewalk, 2016/10 N Hen-16 S Gorge → Sennin Valley Dam → Azohara Onsen Goya

From the lower corridor in the 2016 / 10 / 15 to 17, from the old Nichido trail route, from the lodge Kuroyon of the XNUM day 2 / 10 to Azohara Onsen Goya, S-shaped → Senjindani Dam → Azohara Onsen Goya ed. The travel map is here. On this day's journey, lodge Kuroyon → Kurobe Dam → Built-In Sotani Ide → Betsukan Valley Ide → Hakuryu Gorge → Cross Gorge → S-shaped Gorge → Senjin Valley Dam → Azohara Onsen Goya. More

From the lower corridor, the old Nichido footpath, and the horizontal footpath route that I have walked on the date of 2016 / 10 / 15 to 17, from Azohara Onsen Goya on XNUM X day 3 / 10 Oriodani Sabo embankment tunnel → large drum edition. The travel map is here. The journey on this day is Azohara Onsen Goya → Oriodani Sabo embankment tunnel → large drum → Shiaitani tunnel → Kiritani → Kotohira → Unazuki → Unazuki → Toyama → Tokyo.

2016 Lower corridor, walking on horizontal footpath 10/17 hen-1 Azohara Onsen Goya → Oodaiko

From the lower corridor, the old Nichido footpath, and the horizontal footpath route that I have walked on the date of 2016 / 10 / 15 to 17, from Azohara Onsen Goya on XNUM X day 3 / 10 Oriodani Sabo embankment tunnel → large drum edition. The travel map is here. The journey on this day is Azohara Onsen Goya → Oriodani Sabo embankment tunnel → large drum → Shiaitani tunnel → Kiritani → Kotohira → Unazuki → Unazuki → Toyama → Tokyo. More

From the lower corridor, the old Nichido footpath, and the horizontal footpath route that I have walked on the date of 2016 / 10 / 15 to 17, from Azohara Onsen Goya on XNUM X day 3 / 10 through Kotohira to the area of ​​Unazuki Aiya Tunnel → Shinpei Hen. The travel map is here. The journey on this day is Azohara Onsen Goya → Oriodani Sabo embankment tunnel → large drum → Shiaitani tunnel → Kiritani → Kotohira → Unazuki → Unazuki → Toyama → Tokyo.

2016 Lower corridor, walking on the horizontal footpath

From the lower corridor, the old Nichido footpath, and the horizontal footpath route that I have walked on the date of 2016 / 10 / 15 to 17, from Azohara Onsen Goya on XNUM X day 3 / 10 through Kotohira to the area of ​​Unazuki Aiya Tunnel → Shinpei Hen. The travel map is here. The journey on this day is Azohara Onsen Goya → Oriodani Sabo embankment tunnel → large drum → Shiaitani tunnel → Kiritani → Kotohira → Unazuki → Unazuki → Toyama → Tokyo. More

From the lower corridor, the old Nichido footpath, and the horizontal footpath route that I have walked on the date of 2016 / 10 / 15 to 17, from Azohara Onsen Goya on XNUM X day 3 / 10 → Toyama edition. The travel map is here. The journey on this day is Azohara Onsen Goya → Oriodani → Daikoko → Shiaitani Tunnel → Ashiya → Kotohira → Unazuki → Toyama → Tokyo. Also includes the eating walk in Toyama.

Walk down the horizontal walkway, 2016/10 -- 17 Keyakidaira → Unazuki → Toyama

From the lower corridor, the old Nichido footpath, and the horizontal footpath route that I have walked on the date of 2016 / 10 / 15 to 17, from Azohara Onsen Goya on XNUM X day 3 / 10 → Toyama edition. The travel map is here. The journey on this day is Azohara Onsen Goya → Oriodani → Daikoko → Shiaitani Tunnel → Ashiya → Kotohira → Unazuki → Toyama → Tokyo. Also includes the eating walk in Toyama. More

Leave a comment

What's your evaluation?

avatar image

Distributor PORTALFIELD Takahashi

Thank you for using PORTALFIELD. I look forward to meeting wonderful people, introducing them to you, and providing new services. We are aiming for a convenient and familiar service that can be used by as many people as possible, so please look forward to it. Make your field activities even more enjoyable, such as mountaineering, skiing, camping, and outdoor activities.

What is the "fill power" of feathers?

"Yukudo Shoten" A place where you can meet mountains-related books in Jimbocho, the world's best old book district Part 1: Story of third-generation store owner Masao Suwa